I have seen companies building data centre without proper calculations. It’s end up different concerns. Data centre area / size, location, cooling, power, UPS, accessibility, maintenance, scalability, etc. If we do a proper calculation and consider all the aspects of its design we can avoid such incidents. Some scenarios after completing the design / construction understand that site don’t 3 phase power source, difficulty of water in line / drain piping of CCU. Difficulty of bring or move racks / CCU / UPS / Battery pack to data centre. Difficulty to add redundant power source, or due to the area unable to fix generator. Difficult to construct solid walls. Power backups and cost of equipments.
APC providing some tools to help us in the design / planning data centre.
• Data Center Efficiency Calculator
• UPS Efficiency Comparison Calculator
• Data Center Capital Cost Calculator
• Data Center Power Sizing Calculator
• IT Equipment Cooling Calculator
Read More:-
APC Tools





Follow Me
LinkedIn
Facebook

July 12th, 2010
Abdul Saleem
Posted in
Tags: 

img>

hello,what an excellent article this is,I found it on bing and I like it very much,I agree with you, lots of things will be learned form your site,but I am not follw well with the last part,can you explain it for me ?I need your answer,and I will keep on watching your blog